Revised Quotation for 2-Storey House Construction Using Hollow Blocks/Bricks

Client: Michael Dan Santiago
Location: Gingoog City
Date: Oct 20, 2024


I. Project Overview

  • Project Description: Construction of a 3×6 meter, 2-storey house (L-Type House) using hollow blocks or bricks instead of containers. The project includes concrete foundations, brick or hollow block walls, and traditional roofing.

II. Scope of Work

  1. Site Preparation and Foundations
    • Ground clearing and grading.
    • Foundation setup (concrete slab for brick/block structure support).
  2. Structural Work
    • Construction using hollow blocks or bricks for both floors.
    • Reinforcement of walls with columns and beams.
    • Installation of exterior stairs and roof deck.
  3. Interior Work
    • Installation of glass sliding doors (ground floor).
    • Installation of steel doors.
    • Electrical and plumbing installations (kitchen, bathroom, and lighting).
  4. Exterior and Roofing
    • Roofing installation over the second-floor deck.
    • Minor landscaping (optional, as per client’s request).
  5. Final Finishing and Inspection
    • Painting, sealing, and ensuring all utilities are operational.
    • Final inspection for compliance with building codes.

III. Cost Breakdown

Item DescriptionQtyUnit Price (PHP)Total (PHP)
1. Site Preparation
Clearing and grading1 lot15,00015,000
Foundation (concrete slab)1 lot35,00035,000
2. Hollow Blocks/Brick Structure
Hollow blocks (6″ thick)500 pcs35/block17,500
Cement100 bags300/bag30,000
Sand and gravel1 lot25,00025,000
Reinforcement steel bars (12mm)500 kg55/kg27,500
Brick or block laying labor1 lot50,00050,000
Columns and beams1 lot45,00045,000
Exterior stairs and handrails1 lot45,00045,000
Roof deck construction1 lot65,00065,000
3. Roofing and Finishes
Metal roofing sheets (deck cover)30 sqm500/sqm15,000
4. Interior Work
Electrical system1 lot40,00040,000
Plumbing system1 lot30,00030,000
Glass sliding door (ground floor)1 unit25,00025,000
Steel door2 units10,000/unit20,000
Interior finishing (walls, ceiling)36 sqm800/sqm28,800
Flooring (vinyl or tile options)36 sqm1,200/sqm43,200
5. Labor and Miscellaneous
Labor (skilled workers)1 lot150,000150,000
Transportation of materials1 lot30,00030,000
Miscellaneous expenses (permits, etc.)1 lot20,00020,000

| Total Estimated Cost | | | 786,000 PHP |


IV. Additional Considerations

  • Timeline: The project is estimated to take around 2 to 3 months for completion, depending on weather conditions and material availability.
  • Payment Terms:
    • 30% upon contract signing for procurement of materials and initial site work.
    • 30% midway through construction (after completion of structural work).
    • 40% upon project completion and final inspection.

V. Exclusions

  • Landscaping beyond the basic open area.
  • Additional furnishings (e.g., kitchen cabinetry, built-in closets).
  • Any additional requests or changes to the design during construction may affect the final cost.

VI. Contact Details

  • Company Name: JMG Construction & General Merchandise
  • Email: teamjmg@googlegroups.com
  • Mobile: 09996196855